Mechanical evaluation · insertion and withdrawal
Verification begins
with the requirement.
Define test conditions and acceptance criteria alongside your connector specification.
Mating and unmating force.
Dimensions that determine fit and alignment.
Exposure conditions and surface finish.
Part, supplier and report scope.
Specify the evidence
your project needs.
Include the part number and the approval requirement.
Identify the part
Drawing revision, material and finish.
Define the test
Method, conditions and acceptance criteria.
Check the scope
Applicable product, entity and issue details.





